In a workshop, cutting a panel takes a time that is Normal with mean 14 minutes and standard deviation 2.5 minutes. Finishing a different panel takes an independent time that is Normal with mean 20 minutes and standard deviation 3.0 minutes. What is the probability that cutting one panel takes longer than 0.6 times the time to finish the other?