HelpContactFor teachers and institutes
>_StemPy Lab
Mock TestsClasses

>_StemPy Lab

Learn. Solve. Code the solutions. Test yourself.

Live examsFree mock exams, timed and rankedEveryone starts together, and your score and rank come the moment it ends.See the exams →
Live examsInternational live exams are comingTell us which exam you want first. Timed practice papers are open now.See what is coming →

Learn

  • Physics
  • Chemistry
  • Mathematics
  • Biology
  • Python Programming
  • Statistics & Data Science
  • Computer Science
  • Space Science and Astronomy
  • Earth and Environmental Science
  • Classes
  • Groups

Practice

  • Problems
  • Quizzes
  • Mock Tests
  • Prepare for an Exam
  • Question Sets
  • Exams
  • Certificates
  • Python Labs
  • AI Practice Generator
  • Student-Created Tests

Community

  • Discussions
  • Resources
  • Notes
  • Glossary
  • Blog

Account

  • Log in
© 2026 senLearn. All rights reserved.HelpFor SchoolsAboutContactPrivacy PolicyTerms of UseRefund Policy
  1. Problems
  2. /Three towns are scored from 1 to 10. Town A has a hazard score of 6, a vulnerability of 8 and a…
MediumEarth and Environmental ScienceHigh School (9–10)Natural HazardsNumericalConceptualICSE
+1 more exams
IGCSE
IGCSE

Three towns are scored from 1 to 10. Town A has a hazard score of 6, a vulnerability of 8 and a…

StemPy LabContributed by StemPy Lab

Try it on paper first. A hint, the key idea and the worked solution are here when you need them.

Three towns are scored from 1 to 10. Town A has a hazard score of 666, a vulnerability of 888 and a capacity to cope of 222. Town B has 666, 333 and 666. Town C has 999, 444 and 333. (a) What is the risk score of town A? (b) What is the risk score of town B? (c) How many times as high is the risk of town A as the risk of town B? (d) Town A doubles its capacity to cope, with the same hazard and vulnerability. What is its new risk score?

Check your answer

Work it out on paper, then type your number. The answer itself stays hidden.

times
Need a reminder? The key ideaShowHide

In a simple model each part has a score from 1 to 10 and

Risk=H×VC\displaystyle \text{Risk} = \dfrac{H \times V}{C}Risk=CH×V​

where HHH is the hazard, VVV the vulnerability and CCC the capacity to cope.

The worked solution

Check an answer or open a hint to unlock the worked solution.

Have you tried it?

Work it out on paper first. It is fine to get stuck or make a mistake: that is how we learn. When you are ready, go through the solution one step at a time, and check each step against your own.

Step 1. Town A. R=6×82=24R = \dfrac{6 \times 8}{2} = 24R=26×8​=24.

Step 2. Town B. R=6×36=3R = \dfrac{6 \times 3}{6} = 3R=66×3​=3.

Step 3. The ratio. 24÷3=824 \div 3 = 824÷3=8 times.

Step 4. Town A with more capacity. R=6×84=12R = \dfrac{6 \times 8}{4} = 12R=46×8​=12. The risk halves.

Step 5. Town C. R=9×43=12R = \dfrac{9 \times 4}{3} = 12R=39×4​=12. It has the same risk as town A after the change, though its hazard is stronger.

Answer: 242424; 333; 888 times; 121212.

Check. The two towns have the same hazard. Town A has a vulnerability that is more than twice as high, and a capacity that is three times lower, so a ratio of 888 is reasonable.

Log in to save this for later
← All Problems
← In 2010 an earthquake of magnitude 7.0 struck Haiti, and about 200 000 people died…Two disasters are compared. The table gives the numbers of deaths and the losses… →
More onNatural Hazards

Discussion (0)

Log in to join the discussion.

Loading…

Learn it in

  1. Hazard, vulnerability and riskRisk, Warning and Preparation: Managing Hazards

More on this topic

  1. A district can pay for only one of three measures…Hard
  2. A city must move 600 000 people out of a danger zone…Medium
  3. About 480 000 people live in a cyclone danger zone…Easy
  4. An earthquake under the sea is 600 km from a coast…
Hard
  • An earthquake early warning system sends its alert 9 s after the earthquake begins…Medium